The Operating System for
AI Power Infrastructure.
GridOS shortens time-to-power for AI data centers, industrial facilities, and the developers who build for them — collapsing fragmented interconnection, compliance, and procurement workflows into one platform. Generation-agnostic. Live today in Illinois, expanding across PJM, MISO, and ERCOT.
AI growth is no longer gated by chips — it is gated by electricity: grid capacity, interconnection timelines, and permitting. The workflow from “we need power” to “we have power” is fragmented across law firms, consultants, and utility bureaucracy, and is ripe for a software layer. Whoever owns that workflow captures the value in the AI buildout — regardless of which generation source clears the grid fastest. That company is GridOS.
Power is now the bottleneck, not compute.
Lawrence Berkeley National Laboratory’s most recent “Queued Up” analysis found roughly 8,200 projects actively seeking interconnection nationally — about 1,312 GW of generation and storage capacity. For projects reaching commercial operation in 2025, the median time from interconnection request to commercial operation exceeded five years. Historically, only about 13% of the capacity that requested interconnection between 2000 and 2020 had actually reached commercial operation.
Securing power is now frequently the longest, least predictable item on the critical path — longer than construction, longer than permitting the building itself. GridOS makes that path predictable.
One platform. Six compounding modules.
Each phase is fundable and sellable on its own while compounding toward the larger platform. GridOS starts where SolarAI already has a live, revenue-generating product and expands into interconnection intelligence, procurement, and — longer term — direct deployment of compute wherever power clears fastest.
Two tracks. One platform.
1. Book a 30-minute CESP intake call
We collect facility details, clean energy commitment %, procurement strategy, and developer attestation info — required to meet ICC submission standards.
2. We generate your 9-section CESP in 24 hours
Our AI engine drafts the full ICC-ready Clean Energy Supply Plan: executive summary, facility description, clean energy commitment, procurement pathway, site feasibility, financial summary, timeline & milestones, compliance mechanisms, and developer attestation.
3. Submit to the ICC and enter the expedited queue
Download the final PDF, submit via the ICC e-Docket system, and move your interconnection application into the fast-track review process. You’ve just saved 3–5 years.
1. Enter your Illinois site address
Geocode any Illinois address to county, census tract, and equity jurisdiction.
2. Get instant REC projection, ILSFA eligibility, and project score
20-year revenue forecast, IRA adder stack calculation, and 0–100 viability score with GREEN/YELLOW/RED recommendation.
3. Download the report or upgrade to Pro for pipeline CRM
Investor-grade PDF reports or full project pipeline management with application tracking and benchmark data.
Need just the CESP? No subscription required.
$999 per CESP — One-time payment
For developers who need the ICC-ready compliance document and don’t need ongoing pipeline management. The live proof point inside GridOS.
- ✓ Full intake consultation (30-minute video call with ICC-certified team)
- ✓ AI-generated 9-section CESP document formatted to Illinois Commerce Commission standards
- ✓ One round of revisions based on your feedback
- ✓ Delivery within 5 business days
- ✓ Downloadable PDF ready for ICC e-Docket submission
- ✓ No subscription required — pay once, own the document
Transparent pricing. Infrastructure software, not a commodity.
No subscription required. The GridOS entry point for data center developers.